The long-term popularity of slate is explained by its affordable price, durability and mechanical strength. This is the construction process, how to lay slate, must be carried out in the following sequence:
- preparatory work, which include calculation, purchase and delivery of the required volume of this building material;
- installation of sheathing, which coincides with the arrangement of the waterproofing layer;
- installation of slate sheets.
After delivering the required amount of material to the site, it is necessary to begin preparing a reliable and high-quality foundation for the future roof.. A high-quality base can be considered a lathing made of dry wood bars in a section of at least 50×50 mm.
According to the standards, these bars are placed from the roof eaves to the ridge with a pitch of about 530 mm. You need to plan the size of the sheathing like this:, so that in the future a whole number of sheets can be placed on it on all fronts.
A wooden beam should be secured to the ridge, and from there you need to strengthen two beams on both sides along the entire length of the roof. After completing the installation of the slopes, you need to install the brackets on the bars and attach the ridge bar to them, then cover it along the entire length with roofing felt.
After a painstaking inspection of the slate for defects, it should be prepared for installation, To do this you need to pre-drill holes, trim longitudinal strips or corners. Laying technology can be done in 2 ways:
- with the embodiment of corner cuts of this material;
- with offset (staggered sheets).
Depending on the roof configuration and other criteria, one of the installation methods is selected. Offset installation is recommended in this case, when the roof has a small vertical and wide horizontal slope. Using this method, not satisfied with the eaves overhang.
1-This method is used, when the roof slope is long vertically and not wide horizontally. In this case, you have to saw off the corners of some sheets. When laying from right to left, you need to cut off the right corners, in the left to right option - left.
Main, at the very beginning, ensure the direct direction of the first row, by pulling the cord or nailing the rail. Installation of sheets must be done from bottom to top, and take into account the direction of the wind. There is no need to organize vapor barrier and waterproofing, but if the attic is used (rooms under the roof), then you can lay any thermal insulation. Nails for fastening are used with an iron washer, but you definitely need to put a roofing felt washer under them.